Home

  • name
  • date
  • location
  • status
  • category
016 CUL
2021
Diksmuide
competition
culture, educational

Extention of the public library and music school.

015 EVE
2021
Diksmuide
design
culture, public

Event hall and community centre 

 
014 JOO
2020
Brussel
design
museum

Transformation of the Jewish Museum of Belgium in collaboration with Barozzi Veiga and Barbara Van der Wee Architects

012 AFR
2019
Gent
completed
urban design

Urban design study Afrikalaan: a design strategy for a productive residential city

011 KUN
2019
Kortrijk
design
museum

Open Oproep 3803 Kunst- en tentoonstellingssite Kortrijk in collaboration with Barozzi Veiga and Koplamp Architecten

010 ALI
2019
Antwerpen
design
recreation, housing

Mixed urban residential development with community centre

009 FAB
2019
Gent
completed
urban design

Design research Fabiolalaan zone B commissioned by the city of Gent and Stadsbouwmeester Gent

007 TAN
2018
Avelgem
under construction
healthcare

Dental group practice

005 BOS
2017
Kessel-lo
under construction
house

A house in a forest

004 BRA
2017
Leuven
under construction
housing, commercial

160 housing units, commercial spaces, underground parking, collective garden and urban space

003 STO
2017
Zulte
completed
production, office

Masterplan reorganization industrial site. Office building and production hall with landscaping

002 HEN
2017
Gent
completed
interior

Interior design apartment

001 WES
2013
Deerlijk
completed
production, office

A location with great accessibility and visibility from the E17. A production and supply company for the funeral sector. A strange combination. The building, constructed from banal industrial concrete slabs, is positioned parallel to the motorway and therefore seems to fit in functionally with the landscape of the motorway. At the same time, it doesn't care: the façades are folded inwards around patios to allow daylight into the offices and the production hall. Only the flat, rather closed 'motorway façade' is finished with mirrored polished black granite, the material that this company is all about. In this way, this volume still conforms to the laws of the motorway and the façade works like a life-size billboard.

Office building and production hall with landscaping.

Office building and production hall with landscaping

011KUN - We won the 'Open Oproep' competition for the art and exhibition site of Kortrijk! In colaboration with Barozzi Veiga and Koplamp Architecten.

015EVE - Tab Architects wins the competition for the new event hall and community centre of Diksmuide!

 

002HEN - Nice article in De Morgen Magazine about our interior realisation

 

014JOO - The international architecture magazine Bauwelt publishes our design for the Jewish Museum in its issue 2-2021

 

003STO - The new office building and production hall for Stone have been completed

014JOO - Full page article in De Standaard: "Jonge generatie zet verbouwing Joods Museum naar haar hand." 

 

014JOO - We won the competition for the Jewish Museum of Belgium! In collaboration with Barozzi Veiga and Barbara Van der Wee Architects.

 

Tab Architects is selected for the competition for the extension of the library and the art academy at the Cultuursite in Diksmuide

 

004BRA - construction The View has started

Tab Architects is selected for the competition for a new event hall on the 'Boterhalle' site in Diksmuide

Tab Architects is selected for the competition for the transformation of the Jewish Museum Belgium

Tab Architects is selected for the Open Oproep competition Kunst- en Tentoonstellingssite Kortrijk i.c.w. Barozzi Veiga

Tab Architects selected as young promising architect by Stadsbouwmeester Gent

003STO — Construction project Stone has started

004BRA — Demolition Brandweersite has started

Best wishes for 2019!
002HEN — interior design apartment completed